
Paraburdoo Drainage Infrastructure Replacement
Repair and replacement of drainage infrastructure for the Shire of Ashburton
Project Overview
Leeuwin Civil successfully completed the repair and replacement of drainage infrastructure for the Shire of Ashburton in Paraburdoo. Works required the supply and installation of all materials, disposal and demolition of existing stormwater drainage, and subsequent installation of new stormwater drainage in various locations across Paraburdoo. Associated works included reinstatement of carparks, roadworks, verges and footpaths.
The successful completion of the project also led to a two-year dayworks contract, which included the assessment, removal and replacement of current insitu drainage infrastructure of between 300-1200 mm in diameter. It also included installation of pits, gullies, and reinstatement of roads, parklands, verges and footpaths.
Scope of Works:
- Excavation, disposal/demolition of existing drainage
- Supply and installation of new drainage
- Reconstruction of carparks, roads, verges & footpaths.
