Project Overview

Leeuwin Civil was engaged by the Shire of Augusta Margaret River to construct a full-sized playing field (oval) at Gloucester Park in Margaret River. The area was the last of the sections to be allocated and had an area totaling 12,000 m².

Scope of Works

  • Application of environmental controls, e.g. relocation of endangered species, silt curtains
  • Vegetation clearing
  • Supply and installation of sand/fill (totaling 14,000 m³)
  • Sub soil drainage system installation
  • Irrigation system installation, connection to existing system and commissioning
  • Turf installation, mowing and top dressing
  • Installation of minor drainage works.

Project Details

CLIENTShire of Augusta, Margaret River
LOCATIONMargaret River, Western Australia
YEAR2013
STATUSComplete

Project Gallery